Skip to content

207 - ATPL - According to the EASA-OPS requirement, the route of a twin-engine aircraft, non ETOPS, with a maximum certificated take-off mass exceeding 45360 kg or a maximum seating configuration of 20 passengers or more must be planned in such a way that on one engine an adequate aerodrome can be reached within:

Question 207 - Operational Procedures - ATPL - Airline Transport Pilot license

30 minutes at the cruise speed, one engine inoperative.
60 minutes at the cruise speed, one engine inoperative.
120 minutes at the cruise speed, one engine inoperative.
90 minutes at the cruise speed, one engine inoperative.

Training tests and timed exam simulations ATPL - Airline Transport Pilot license