Skip to content

4 - ATPL Question Bank in English - For approved operations on the Shanwick Tango routes T9 and T290, with the required RNP 2 Continental capability and ADS-B equipment, what is the minimum number of long-range navigation systems (LRNS)?

Question 4 - Operational Procedures - ATPL - Airline Transport Pilot Licence

Two Inertial Navigation Systems (INS)
Three Inertial Navigation System (INS)
Two independent Long Range Navigation Systems (LRNS)
One Long Range Navigation System (LRNS)

This is 1 of over 300 exam questions on Operational Procedures

Take a test with 10 questions

Training tests and timed exam simulations ATPL - Airline Transport Pilot Licence