Skip to content

69 - ATPL Question Bank in English - Under the basic CAT fuel scheme variation for a non-isolated destination without an alternate, the flight-duration and two-usable-runway conditions are met. The required forecast ceiling (at least 2,000 ft or circling height plus 500 ft, whichever is higher) and ground visibility of at least 5 km must cover which period around ETA?

Question 69 - Operational Procedures - ATPL - Airline Transport Pilot Licence

2 hours before to at least 2 hours after the expected time of arrival
3 hours before to at least 1 hour after the expected time of arrival
1 hour before to at least 1 hour after the expected time of arrival
3 hours before to at least 3 hours after the expected time of arrival

This is 1 of over 300 exam questions on Operational Procedures

Take a test with 10 questions

Training tests and timed exam simulations ATPL - Airline Transport Pilot Licence