Arrival and Approach segments, General. What are the names of all separate segments that can be part of an instrument approach procedure?4
Answers
Approach Procedures - Circling. It is permissible to eliminate from consideration a particular sector where a prominent obstacle exists in the visual manoeuvring (circling) area outside the final approach and missed approach area. When this option is exercised, the published procedure:4
Answers
Holding procedures (outbound time). The outbound time in a holding pattern at 14000 ft or below in still air conditions is:4
Answers
Altimeter setting procedures - Transition Layer. When flying through the transition layer the vertical position of the aircraft should be expressed as:4
Answers
When an aircraft has sustained damage, the aircraft shall be allowed to resume its flight, if4
Answers
A Control Zone shall extend laterally to at least:4
Answers
The Alerting Service is provided by:4
Answers
When an aircraft will pass through the level of another aircraft on the same track, the following minimum longitudinal separation shall be provided:4
Answers
The speed limitation for IFR flights inside ATS airspace classified as C, when flying below3.050 m (10.000 ft) AMSL, is:4
Answers
A VFR flight when flying inside an ATS airspace classified as C has to maintain the following minima of flight visibility and distance from clouds4
Answers

Other exam subjects ATPL - Airline Transport Pilot license